Planning

What is listed building consent, and when do I need it?

Listed building consent is required for works affecting a listed building's special interest, inside as well as out. It carries no application fee, but it is a criminal offence to carry out works without it, and the protection covers the whole building rather than the facade.

David Campbell

6 min read

Planning

What is a side return extension, and do I need permission?

A side return extension infills the narrow strip of land beside the rear projection of a Victorian or Edwardian terrace. It typically adds 8 to 15 square metres, transforms a dark galley kitchen, and usually requires a planning application rather than permitted development.

David Campbell

6 min read

Process

How long does a house extension take in London?

A London extension typically takes six to twelve months from first conversation to completion. Construction is only twelve to sixteen weeks of that for single-storey work. The rest is design, consent, party wall notices and tendering, most of which runs before anyone arrives on site.

David Campbell

6 min read

Planning

How does a householder planning application work in London?

A householder planning application is the ordinary route for extensions that fall outside permitted development. It costs £548 in England, has a statutory determination period of eight weeks from validation, and is judged on policy, design and the effect on neighbours.

Chris Cheuk

7 min read

Planning

What is prior approval, and can I extend 6 metres without planning permission?

Prior approval lets you build a single-storey rear extension up to 6 metres on a terrace or semi and 8 metres on a detached house. It costs £249 against £548 for a householder application, runs to 42 days, and the council can only refuse on neighbour amenity.

David Campbell

6 min read

Cost

Should I extend or move? The numbers for London homeowners

Moving typically costs 8 to 10 per cent of a property's value in transaction costs alone, before you gain any additional space. Extending converts that same money into square metres, provided your street has room above its ceiling price.

Chris Cheuk

6 min read

Process

Do I need building regulations approval as well as planning permission?

Planning permission and building regulations are two separate approvals granted by two different teams against two different tests. Almost every extension needs building regulations approval, whether or not it needs planning permission.

David Campbell

6 min read

Process

How do I compare builders' quotes for an extension?

Comparing builders' quotations only works when every contractor prices the same drawings and specification. Where they do not, the cheapest number usually reflects the most that has been left out rather than the keenest price.

David Campbell

6 min read

Planning

What is an Article 4 direction, and what does it mean for my extension?

An Article 4 direction is a local council decision that withdraws permitted development rights across a mapped area, meaning work that needs no application elsewhere requires a full planning application on your address.

David Campbell

5 min read

Planning

Can I convert my loft, and do I need planning permission?

A loft conversion is often permitted development within volume limits of 40 cubic metres for a terrace and 50 for a semi or detached house, but conservation area status usually removes that. Head height decides feasibility before any rule does.

Chris Cheuk

7 min read

Cost

How much does a rear extension cost in London in 2026?

A London rear extension costs £3,000 to £5,000 per square metre to build, depending on specification. Once professional fees, statutory costs, contingency and VAT are added, the total project cost runs roughly 45 to 55 per cent above the construction figure.

Chris Cheuk

7 min read

Planning

Do I need planning permission for a rear extension in London?

Many London rear extensions are permitted development and need no planning application, but the answer turns on depth, height, boundary distance and whether your property is listed, in a conservation area or covered by an Article 4 direction.

David Campbell

6 min read