Will my extension need planning permission?

Answer a short set of questions about your property and its constraints for an indicative read on your consent route, the risks that will shape the application, and what to do next. Free, and no email required.

Planning Feasibility Assessment

Answer a few quick questions for an indicative read on your planning route before a formal review.

Project basics
Site constraints

Indicative guidance only, not formal planning advice. Project-specific review is always recommended. Rules current as at Q3 2026.

02 · WHAT THE ASSESSMENT TESTS

Route first, design second.

Four things decide the consent route before any drawing is made: what you are building, whether the property is listed, whether it sits in a conservation area, and whether an Article 4 direction applies to your street. Any one of the last three can remove permitted development rights entirely, whatever the dimensions of your proposal.

The assessment then flags the constraints that add risk rather than remove rights: flood zone, protected trees, basement works, highways and parking impact, and likely overlooking of neighbours. None of these stops a scheme. Each one changes what the application has to answer, and how long it takes.

This is indicative guidance, not formal planning advice. Where an answer is unsure, the result says so rather than guessing, because a designation confirmed late is the most expensive kind of surprise: it means a redesign after the scheme has been drawn to limits that were never available.